jebelahmed4 jebelahmed4
  • 02-12-2019
  • Mathematics
contestada

A road crew can repave 1/30 miles of road each hour. They must repave a road that is 2/5 miles long. How long will it take the crew to repave the road?

Write your answer in simplest form.

Respuesta :

sippyside
sippyside sippyside
  • 02-12-2019

2/5= 12/30

The road is 12/30 miles long, they pave 1/30 each hour.

60x12= 720 minutes= 12 hours

Answer Link

Otras preguntas

Having a clear vision provides meaning and purpose to what you do. True False
CRITICAL THINKING A local zoo employs 36 people to take care of the animals each day. At most, 24 of the employees work full time. Write and solve an inequality
80% of 60 is 1/5 of what number?
the product of a number and 3 + 1 is 19
Peter has 15 construction sets in his collection. John has 5 more construction sets than Peter. What is the ratio of John’s construction sets to Peter’s constru
What is the genus of the popular fossils which are similar to "lucy"?
5-8(a-3)=93 what is a? and how do I get the answer?
In 1590, which early American colony disappeared without a trace?
which stratery helps fight infections in the body
Modern fishing techniques use giant nets to harvest large numbers of fish in the short term. this may result in severely reduced populations of fish in the futu