The method of dividing the project scope into many parts that, when combined, would constitute the project deliverable is called _____:

Respuesta :

gomezgerman032 gomezgerman032
  • 04-01-2020

Answer:

decomposition

Explanation:

This is a technique used to divide and subdivide the scope of the project and the future to deliver, in smaller and more manageable parts. It is defined what work is going to be done and which is not. It is a hierarchical decomposition oriented to the deliverable product of work and achieve the objectives of the project.

Answer Link

Otras preguntas

what is 33 %of what number is 1.45
An estate valued at $75,000 is divided among three daughters. In the ratio 5:8:2 respectively. Calculate the amount each receives
______ happens at the end of telophase II.
how do 7.6 be written in word form
what does a ballad consist of?
What kind of precipitation would occur if the temperature was above freezing
A decimal number has 2 digits to the right of it's decimal point. If we round it to the nearest tenth, the result is 18.6. What is the maximum possible value of
What is 216.231 each decimal in words
Sid wrote 541,309 on his paper. Using words and numbers explain how the number would change if he switched the digits in the hundred thousands and tens place
a football team gained 9 yards on one play and then lost 22 yards on the next .write a sum of integers to find the overall change in field position explain your