leila839 leila839
  • 03-02-2021
  • Mathematics
contestada

Q11.
It takes 3 painters 2 days to complete a job. Work out how long 1 painter would take.

Respuesta :

26liujiaying
26liujiaying 26liujiaying
  • 03-02-2021

Answer:

6

Step-by-step explanation:

1 painter is 1/3 of 3 painters, so the answer is 2 x 3=6

Hope I helped!

Answer Link

Otras preguntas

Susan invests twice as much money at 7.5% as she does at 6%. If her total interest after a year is $840 how much does she have invested at each rate?
How is the graph of y=-8x^2-2 diffrent from the graph of y=-8x^2
what was the basic Sumerian building material?
rachel has a collection of 40 stuffed animals . of the stuffed animals 3/8 are bears and 1/5 are dogs the rest are other animals . how many other animals does s
If you know two points on a line, how can you find the rate of change of the variables being graphed?
why is water so important in metabolism
'This life is more important than the next' - Discuss statement Include Christian views - Catholic and Church of England
name 1 element in the periodic table that sounds like a name
What is the value of f(-4) in the piecewise function f(x)= -x-5 for -5<= x <= -2; -x^2+1 for -2<=x<=2; (x-3)^2+2 for 2<=x<=4? If that makes an
how are plains formed